Skip to content
DATACENTERATLAS
National overview

Market profile

Mississippi.

2 tracked Mississippi data center facilities, organized by scale, development stage, and source provenance.

Coverage

2 facilities

Market summary

Facilities

M01

2

Tracked in this market

Atlas rollup · Sep 2028

Tracked power

M02

512 MW

Permit proxy, known records only

Atlas rollup · Sep 2028

Pipeline

M03

0

Announced through construction

Atlas rollup · Sep 2028

01 / Lifecycle distribution

Status breakdown

All eight lifecycle states use one consistent visual scale.

Announced

0

Sep 2028
Planned

0

Sep 2028
Permitted

0

Sep 2028
Under construction

0

Sep 2028
Completed

0

Sep 2028
Operational

2

Sep 2028
Cancelled

0

Sep 2028
Unknown

0

Sep 2028

02 / Operator concentration

Top operators

Ranked by facility count within this market.

Power coverage

Select power coverage

Facility count

Facility count range

Tracked power

Tracked power range in MW

1 of 1 records in viewShift and select a column for multi-sort
Amazon
Sep 2028
2Sep 2028
512 MWSep 2028

Rows 1 to 1 of 1

1 / 1

03 / Lifecycle feed

Market pipeline

Recent sourced status changes in this market.

  1. Amazon RidgelandOperational
    MississippiMay 2026

04 / Market inventory

All facilities

Filter by lifecycle state or operator, search across records, set ranges, and combine sort levels.

Status

Select status

Operator

Select operator

Power proxy

Power proxy range in MW

Buildings

Buildings range

2 of 2 records in viewShift and select a column for multi-sort
Amazon
Sep 2028
OperationalSep 2028
284 MWSep 2028
0Sep 2028
Amazon
Sep 2028
OperationalSep 2028
228 MWSep 2028
0Sep 2028

Rows 1 to 2 of 2

1 / 1

05 / Spatial context

Market map

Pins encode current lifecycle status. Open any marker to inspect its facility record.

Facility location mapFacility positions plotted from latitude and longitude, colored by lifecycle status.
Facility positions
PlannedPermittedUnder constructionOperational

Source eligibility

Only claims linked to accepted, publishable source records appear.

Power methodology

Power is derived from generator nameplate values in permits where available.

Market as of

September 29, 2028

Atlas rollup · Sep 2028