Power, permit proxy
F01284 MW
Generator nameplate method
Facility record / amazon-madison-mega-site-madison-mega-site-nissan-parkway-and-highway-22-canton
OperationalRecord state
Publishable claims resolved
Power, permit proxy
F01284 MW
Generator nameplate method
Buildings
F020
Campus child count
Current status
F03Operational
Latest accepted lifecycle claim
Operational date
F04Jun 2025
Milestone date, when available
01 / Lifecycle record
Reached milestones show the date and source. Cancelled, unknown, and verbatim source states render off the canonical path.
Announced / planned
Not reached
Permitted
Not reached
Under construction
Not reached
Completed
Not reached
Operational
Jun 2025
Jun 202502 / Provenance ledger
Every public value is a claim linked to a named source record and an as-of date.
Select claim group
Lifecycle status lifecycle_status | Operational | Epoch AI · Jun 2025 |
Name name | Amazon Madison Mega Site | Epoch AI · Mar 2028 |
Occupancy date occupancy_date | 2025-06-23 | Epoch AI · Jun 2025 |
Operator operator | Amazon | Epoch AI · Mar 2028 |
Power (kW, proxy) power_kw_proxy | 284 MW | Epoch AI · Mar 2028 |
Rows 1 to 5 of 5
03 / Location
Amazon Data Services Inc, Madison Mega Site Nissan Parkway and Highway 22 Canton, Mississippi Madison County
Madison Mega Site Nissan Parkway and Highway 22 Canton, MS
No linked facilities sourced yet.
Facility attributes are resolved from publishable claims. Power is a kW proxy derived from permitted generator nameplate capacity where available. It is not a measured load value.
Facility record as of
March 15, 2028