Skip to content
DATACENTERATLAS
National overview

Market profile

Idaho.

1 tracked Idaho data center facilities, organized by scale, development stage, and source provenance.

Coverage

1 facilities

Market summary

Facilities

M01

1

Tracked in this market

Atlas rollup · Jun 2026

Tracked power

M02

152 MW

Permit proxy, known records only

Atlas rollup · Jun 2026

Pipeline

M03

0

Announced through construction

Atlas rollup · Jun 2026

01 / Lifecycle distribution

Status breakdown

All eight lifecycle states use one consistent visual scale.

Announced

0

Jun 2026
Planned

0

Jun 2026
Permitted

0

Jun 2026
Under construction

0

Jun 2026
Completed

0

Jun 2026
Operational

1

Jun 2026
Cancelled

0

Jun 2026
Unknown

0

Jun 2026

02 / Operator concentration

Top operators

Ranked by facility count within this market.

Power coverage

Select power coverage

Facility count

Facility count range

Tracked power

Tracked power range in MW

1 of 1 records in viewShift and select a column for multi-sort
Meta
Jun 2026
1Jun 2026
152 MWJun 2026

Rows 1 to 1 of 1

1 / 1

03 / Lifecycle feed

Market pipeline

Recent sourced status changes in this market.

  1. Meta KunaOperational
    IdahoJun 2026

04 / Market inventory

All facilities

Filter by lifecycle state or operator, search across records, set ranges, and combine sort levels.

Status

Select status

Operator

Select operator

Power proxy

Power proxy range in MW

Buildings

Buildings range

1 of 1 records in viewShift and select a column for multi-sort
Meta Kuna
Jun 2026
Meta
Jun 2026
OperationalJun 2026
152 MWJun 2026
0Jun 2026

Rows 1 to 1 of 1

1 / 1

05 / Spatial context

Market map

Pins encode current lifecycle status. Open any marker to inspect its facility record.

Facility location mapFacility positions plotted from latitude and longitude, colored by lifecycle status.
Facility positions
PlannedPermittedUnder constructionOperational

Source eligibility

Only claims linked to accepted, publishable source records appear.

Power methodology

Power is derived from generator nameplate values in permits where available.

Market as of

June 1, 2026

Atlas rollup · Jun 2026