Skip to content
DATACENTERATLAS
National overview

Market profile

Arizona.

1 tracked Arizona data center facilities, organized by scale, development stage, and source provenance.

Coverage

1 facilities

Market summary

Facilities

M01

1

Tracked in this market

Atlas rollup · Apr 2026

Tracked power

M02

202 MW

Permit proxy, known records only

Atlas rollup · Apr 2026

Pipeline

M03

0

Announced through construction

Atlas rollup · Apr 2026

01 / Lifecycle distribution

Status breakdown

All eight lifecycle states use one consistent visual scale.

Announced

0

Apr 2026
Planned

0

Apr 2026
Permitted

0

Apr 2026
Under construction

0

Apr 2026
Completed

0

Apr 2026
Operational

1

Apr 2026
Cancelled

0

Apr 2026
Unknown

0

Apr 2026

02 / Operator concentration

Top operators

Ranked by facility count within this market.

Power coverage

Select power coverage

Facility count

Facility count range

Tracked power

Tracked power range in MW

1 of 1 records in viewShift and select a column for multi-sort
Microsoft
Apr 2026
1Apr 2026
202 MWApr 2026

Rows 1 to 1 of 1

1 / 1

03 / Lifecycle feed

Market pipeline

Recent sourced status changes in this market.

  1. ArizonaApr 2023

04 / Market inventory

All facilities

Filter by lifecycle state or operator, search across records, set ranges, and combine sort levels.

Status

Select status

Operator

Select operator

Power proxy

Power proxy range in MW

Buildings

Buildings range

1 of 1 records in viewShift and select a column for multi-sort
Microsoft
Apr 2026
OperationalApr 2026
202 MWApr 2026
0Apr 2026

Rows 1 to 1 of 1

1 / 1

05 / Spatial context

Market map

Pins encode current lifecycle status. Open any marker to inspect its facility record.

Facility location mapFacility positions plotted from latitude and longitude, colored by lifecycle status.
Facility positions
PlannedPermittedUnder constructionOperational

Source eligibility

Only claims linked to accepted, publishable source records appear.

Power methodology

Power is derived from generator nameplate values in permits where available.

Market as of

April 27, 2026

Atlas rollup · Apr 2026