Skip to content
DATACENTERATLAS
Northern Virginia market

Facility record / south-point-phase-ii-building-b

Under construction

South Point Phase II Building B

Operator not yet sourcedNorthern VirginiaFeb 2026

Record state

Publishable claims resolved

Facility key statistics

Power, permit proxy

F01

Not yet sourced

Power not yet sourced

Atlas rollup · Feb 2026

Buildings

F02

0

Campus child count

Atlas rollup · Feb 2026

Operational date

F04

Not yet sourced

Milestone date, when available

Atlas rollup · Feb 2026

01 / Lifecycle record

Facility progression

Reached milestones show the date and source. Cancelled, unknown, and verbatim source states render off the canonical path.

  1. 01

    Announced / planned

    Not reached

  2. 02

    Permitted

    Not reached

  3. Under construction

    Feb 2026

    Feb 2026
  4. 04

    Completed

    Not reached

  5. 05

    Operational

    Not reached

Off-path status recorded

This state is preserved without changing the canonical facility progression.

Issued / Under ConstructionFeb 2026

02 / Provenance ledger

Resolved facts

Every public value is a claim linked to a named source record and an as-of date.

Claim group

Select claim group

5 of 5 records in viewShift and select a column for multi-sort

Building permit case

permit_case

BLD2025-00827Prince William County GIS · Feb 2026

Gross floor area (sq ft)

gfa_sqft

265000Prince William County GIS · Feb 2026

Lifecycle status

lifecycle_status

Under constructionPrince William County GIS · Feb 2026

Name

name

South Point Phase II Building BPrince William County GIS · Feb 2026

Status as published by the source

source_status

[object Object]Prince William County GIS · Feb 2026

Rows 1 to 5 of 5

1 / 1

03 / Location

Facility context

Facility location mapFacility positions plotted from latitude and longitude, colored by lifecycle status.South Point Phase I…South Point Phase I…Amazon IAD74Amazon AWS IAD-74 M…
Facility positions
PlannedPermittedUnder constructionOperational

8400 Buckeye Timber Dr

Prince William, VA

Atlas rollup · Feb 2026

04 / Contextual hubs

Sources and methodology

Facility attributes are resolved from publishable claims. Power is a kW proxy derived from permitted generator nameplate capacity where available. It is not a measured load value.

Facility record as of

February 2, 2026

Atlas rollup · Feb 2026