Skip to content
DATACENTERATLAS
Virginia market

Facility record / sabey-data-centers-ashburn-building-c-ashburn

Operational

Sabey Data Centers Ashburn - Building C

Record state

Publishable claims resolved

Facility key statistics

Power, permit proxy

F01

Not yet sourced

Power not yet sourced

Atlas rollup · Sep 2026

Buildings

F02

0

Campus child count

Atlas rollup · Sep 2026

01 / Lifecycle record

Facility progression

Reached milestones show the date and source. Cancelled, unknown, and verbatim source states render off the canonical path.

  1. 01

    Announced / planned

    Not reached

  2. 02

    Permitted

    Not reached

  3. 03

    Under construction

    Not reached

  4. 04

    Completed

    Not reached

  5. Operational

    Sep 2026

    Sep 2026

Off-path status recorded

This state is preserved without changing the canonical facility progression.

OperatingSep 2026

02 / Provenance ledger

Resolved facts

Every public value is a claim linked to a named source record and an as-of date.

Claim group

Select claim group

6 of 6 records in viewShift and select a column for multi-sort

Air permit registration

air_permit

[object Object]VA DEQ air permit · Sep 2026

Lifecycle status

lifecycle_status

OperationalVA DEQ air permit · Sep 2026

Name

name

Sabey Data Centers Ashburn - Building COpenStreetMap · Sep 2026

Name

name

Intergate - Ashburn, LLCVA DEQ air permit · Sep 2026

Operator

operator

Sabey Data CentersOpenStreetMap · Sep 2026

Rows 1 to 5 of 6

1 / 2

03 / Location

Facility context

Facility location mapFacility positions plotted from latitude and longitude, colored by lifecycle status.Sabey Data Centers …Sabey Data Centers …Sabey Data Centers …Databank Ashburn IA…
Facility positions
PlannedPermittedUnder constructionOperational

21741 Red Rum Drive

Ashburn, VA

Atlas rollup · Sep 2026

04 / Contextual hubs

Sources and methodology

Facility attributes are resolved from publishable claims. Power is a kW proxy derived from permitted generator nameplate capacity where available. It is not a measured load value.

Facility record as of

September 24, 2026

Atlas rollup · Sep 2026