Skip to content
DATACENTERATLAS
Virginia market

Facility record / ntt-ashburn-va2-data-center-ashburn

Operational

NTT Ashburn VA2 Data Center

NTTVirginiaSep 2026

Record state

Publishable claims resolved

Facility key statistics

Power, permit proxy

F01

Not yet sourced

Power not yet sourced

Atlas rollup · Sep 2026

Buildings

F02

0

Campus child count

Atlas rollup · Sep 2026

01 / Lifecycle record

Facility progression

Reached milestones show the date and source. Cancelled, unknown, and verbatim source states render off the canonical path.

  1. 01

    Announced / planned

    Not reached

  2. 02

    Permitted

    Not reached

  3. 03

    Under construction

    Not reached

  4. 04

    Completed

    Not reached

  5. Operational

    Sep 2026

    Sep 2026

Off-path status recorded

This state is preserved without changing the canonical facility progression.

OperatingSep 2026

02 / Provenance ledger

Resolved facts

Every public value is a claim linked to a named source record and an as-of date.

Claim group

Select claim group

6 of 6 records in viewShift and select a column for multi-sort

Air permit registration

air_permit

[object Object]VA DEQ air permit · Sep 2026

Lifecycle status

lifecycle_status

OperationalVA DEQ air permit · Sep 2026

Name

name

NTT Global Data Centers VA2, LLCVA DEQ air permit · Sep 2026

Name

name

NTT Ashburn VA2 Data CenterOpenStreetMap · Sep 2026

Operator

operator

NTTOpenStreetMap · Sep 2026

Rows 1 to 5 of 6

1 / 2

03 / Location

Facility context

Facility location mapFacility positions plotted from latitude and longitude, colored by lifecycle status.NTT Ashburn VA2 Dat…Equinix Ashburn DC18Level 3 AshburnAmazon IAD71
Facility positions
PlannedPermittedUnder constructionOperational

44610 Guilford Drive

Ashburn, VA

Atlas rollup · Sep 2026

04 / Contextual hubs

Sources and methodology

Facility attributes are resolved from publishable claims. Power is a kW proxy derived from permitted generator nameplate capacity where available. It is not a measured load value.

Facility record as of

September 24, 2026

Atlas rollup · Sep 2026