Skip to content
DATACENTERATLAS
Virginia market

Facility record / cyrusone-nva14-ashburn

Planned

CyrusOne NVA14

Record state

Publishable claims resolved

Facility key statistics

Power, permit proxy

F01

Not yet sourced

Power not yet sourced

Atlas rollup · Sep 2026

Buildings

F02

0

Campus child count

Atlas rollup · Sep 2026

Operational date

F04

Not yet sourced

Milestone date, when available

Atlas rollup · Sep 2026

01 / Lifecycle record

Facility progression

Reached milestones show the date and source. Cancelled, unknown, and verbatim source states render off the canonical path.

  1. Announced / planned

    Sep 2026

    Sep 2026
  2. 02

    Permitted

    Not reached

  3. 03

    Under construction

    Not reached

  4. 04

    Completed

    Not reached

  5. 05

    Operational

    Not reached

Off-path status recorded

This state is preserved without changing the canonical facility progression.

PlannedSep 2026

02 / Provenance ledger

Resolved facts

Every public value is a claim linked to a named source record and an as-of date.

Claim group

Select claim group

6 of 6 records in viewShift and select a column for multi-sort

Air permit registration

air_permit

[object Object]VA DEQ air permit · Sep 2026

Lifecycle status

lifecycle_status

PlannedVA DEQ air permit · Sep 2026

Name

name

CyrusOne – NVA14VA DEQ air permit · Sep 2026

Name

name

CyrusOne NVA14OpenStreetMap · Sep 2026

Operator

operator

PowerHouseOpenStreetMap · Sep 2026

Rows 1 to 5 of 6

1 / 2

03 / Location

Facility context

Facility location mapFacility positions plotted from latitude and longitude, colored by lifecycle status.CyrusOne NVA14Equinix Ashburn DC10Centersquare IAD4-AEquinix Ashburn DC15
Facility positions
PlannedPermittedUnder constructionOperational

21529 Beaumeade Circle

Ashburn, VA

Atlas rollup · Sep 2026

04 / Contextual hubs

Sources and methodology

Facility attributes are resolved from publishable claims. Power is a kW proxy derived from permitted generator nameplate capacity where available. It is not a measured load value.

Facility record as of

September 24, 2026

Atlas rollup · Sep 2026