Facilities tracked
R0114
Tracked in this market
Market report / nevada
Nevada data center pipeline: 14 facilities tracked, 0 in the pipeline, 0 operational.
Facilities tracked
R0114
Tracked in this market
In pipeline
R020
Announced through construction
Operational
R030
Live facilities in the market
Gross floor area
R04Not sourced
Sum of sourced gross floor area
01 / Lifecycle distribution
Every count is an aggregate of publishable claims.
14
02 / Operator concentration
Ranked by facility count, then by sourced gross floor area.
Switch Sep 2026 | 8Sep 2026 | Not sourced |
Flexential Sep 2026 | 2Sep 2026 | Not sourced |
Google Sep 2026 | 2Sep 2026 | Not sourced |
DataBank Sep 2026 | 1Sep 2026 | Not sourced |
Fiberhub Sep 2026 | 1Sep 2026 | Not sourced |
Rows 1 to 5 of 5
03 / Lifecycle feed
Newest publishable lifecycle changes in the market.
No recent filings sourced yet.
04 / Power
Power not yet sourced for this market.
05 / Provenance
The distinct source records behind the publishable claims.
Every figure on this page is an aggregate computed from sourced claims in the warehouse. Power figures are a kW proxy from permit generators, not verified nameplate capacity. Report as of 2026-09-22.