Power, permit proxy
F01144 MW
Generator nameplate method
Facility record / qts-richmond-3-sandston
OperationalRecord state
Publishable claims resolved
Power, permit proxy
F01144 MW
Generator nameplate method
Buildings
F020
Campus child count
Current status
F03Operational
Latest accepted lifecycle claim
Operational date
F04Feb 2026
Milestone date, when available
01 / Lifecycle record
Reached milestones show the date and source. Cancelled, unknown, and verbatim source states render off the canonical path.
Announced / planned
Not reached
Permitted
Not reached
Under construction
Not reached
Completed
Not reached
Operational
Feb 2026
Feb 202602 / Provenance ledger
Every public value is a claim linked to a named source record and an as-of date.
Select claim group
Lifecycle status lifecycle_status | Operational | Epoch AI · Feb 2026 |
Name name | QTS Richmond 3 | Epoch AI · Feb 2027 |
Occupancy date occupancy_date | 2026-02-13 | Epoch AI · Feb 2026 |
Power (kW, proxy) power_kw_proxy | 144 MW | Epoch AI · Feb 2027 |
Rows 1 to 4 of 4
03 / Location
3525–3543 Portugee Rd, Sandston, VA 23150
Sandston, VA
No linked facilities sourced yet.
Operator relationship not yet sourced.
Facility attributes are resolved from publishable claims. Power is a kW proxy derived from permitted generator nameplate capacity where available. It is not a measured load value.
Facility record as of
February 13, 2027