Facility record / openai-stargate-milam

Under construction

OpenAI Stargate Milam

SoftbankMarket not sourcedDec 2028

Record state

Publishable claims resolved

Facility key statistics

Buildings

F02

0

Campus child count

Atlas rollup · Dec 2028

Operational date

F04

Not yet sourced

Milestone date, when available

Atlas rollup · Dec 2028

01 / Lifecycle record

Facility progression

Reached milestones show the date and source. Cancelled, unknown, and verbatim source states render off the canonical path.

  1. 01

    Announced / planned

    Not reached

  2. 02

    Permitted

    Not reached

  3. Under construction

    Sep 2025

    Sep 2025
  4. 04

    Completed

    Not reached

  5. 05

    Operational

    Not reached

02 / Provenance ledger

Resolved facts

Every public value is a claim linked to a named source record and an as-of date.

Claim group

Select claim group

4 of 4 records in viewShift and select a column for multi-sort

Lifecycle status

lifecycle_status

Under constructionEpoch AI · Sep 2025

Name

name

OpenAI Stargate MilamEpoch AI · Dec 2028

Operator

operator

SoftbankEpoch AI · Dec 2028

Power (kW, proxy)

power_kw_proxy

0 kWEpoch AI · Dec 2028

Rows 1 to 4 of 4

1 / 1

03 / Location

Facility context

Facility location mapFacility positions plotted from latitude and longitude, colored by lifecycle status.
Facility positions
PlannedPermittedUnder constructionOperational

Street address not sourced

Atlas rollup · Dec 2028

04 / Contextual hubs

Nearby facilities

No linked facilities sourced yet.

Same operator

Same market

No linked facilities sourced yet.

Sources and methodology

Facility attributes are resolved from publishable claims. Power is a kW proxy derived from permitted generator nameplate capacity where available. It is not a measured load value.

Facility record as of

December 31, 2028

Atlas rollup · Dec 2028