Power, permit proxy
F01636 MW
Generator nameplate method
Power, permit proxy
F01636 MW
Generator nameplate method
Buildings
F020
Campus child count
Current status
F03Operational
Latest accepted lifecycle claim
Operational date
F04Oct 2025
Milestone date, when available
01 / Lifecycle record
Reached milestones show the date and source. Cancelled, unknown, and verbatim source states render off the canonical path.
Announced / planned
Not reached
Permitted
Not reached
Under construction
Not reached
Completed
Not reached
Operational
Oct 2025
Oct 202502 / Provenance ledger
Every public value is a claim linked to a named source record and an as-of date.
Select claim group
Lifecycle status lifecycle_status | Operational | Epoch AI · Oct 2025 |
Name name | Microsoft Fairwater Atlanta | Epoch AI · Jun 2026 |
Occupancy date occupancy_date | 2025-10-14 | Epoch AI · Oct 2025 |
Operator operator | Microsoft | Epoch AI · Jun 2026 |
Power (kW, proxy) power_kw_proxy | 636 MW | Epoch AI · Jun 2026 |
Rows 1 to 5 of 5
03 / Location
1435 Hwy 54 W, Fayetteville, GA 30214
Fayetteville, GA
No linked facilities sourced yet.
Facility attributes are resolved from publishable claims. Power is a kW proxy derived from permitted generator nameplate capacity where available. It is not a measured load value.
Facility record as of
June 14, 2026