Power, permit proxy
F01133 MW
Generator nameplate method
Power, permit proxy
F01133 MW
Generator nameplate method
Buildings
F020
Campus child count
Current status
F03Operational
Latest accepted lifecycle claim
Operational date
F04Dec 2025
Milestone date, when available
01 / Lifecycle record
Reached milestones show the date and source. Cancelled, unknown, and verbatim source states render off the canonical path.
Announced / planned
Not reached
Permitted
Not reached
Under construction
Not reached
Completed
Not reached
Operational
Dec 2025
Dec 202502 / Provenance ledger
Every public value is a claim linked to a named source record and an as-of date.
Select claim group
Lifecycle status lifecycle_status | Operational | Epoch AI · Dec 2025 |
Name name | Meta Eagle Mountain | Epoch AI · May 2026 |
Occupancy date occupancy_date | 2025-12-07 | Epoch AI · Dec 2025 |
Operator operator | Meta | Epoch AI · May 2026 |
Power (kW, proxy) power_kw_proxy | 133 MW | Epoch AI · May 2026 |
Rows 1 to 5 of 5
03 / Location
1275 N Community Cir, Eagle Mountain, UT 84005
Eagle Mountain, UT
No linked facilities sourced yet.
Facility attributes are resolved from publishable claims. Power is a kW proxy derived from permitted generator nameplate capacity where available. It is not a measured load value.
Facility record as of
May 2, 2026