Power, permit proxy
F0169 MW
Generator nameplate method
Record state
Publishable claims resolved
Power, permit proxy
F0169 MW
Generator nameplate method
Buildings
F020
Campus child count
Current status
F03Operational
Latest accepted lifecycle claim
Operational date
F04Aug 2026
Milestone date, when available
01 / Lifecycle record
Reached milestones show the date and source. Cancelled, unknown, and verbatim source states render off the canonical path.
Announced / planned
Not reached
Permitted
Not reached
Under construction
Not reached
Completed
Not reached
Operational
Aug 2026
Aug 202602 / Provenance ledger
Every public value is a claim linked to a named source record and an as-of date.
Select claim group
Lifecycle status lifecycle_status | Operational | Epoch AI · Aug 2026 |
Name name | Meta Aiken | Epoch AI · Aug 2026 |
Occupancy date occupancy_date | 2026-08-07 | Epoch AI · Aug 2026 |
Operator operator | Meta | Epoch AI · Aug 2026 |
Power (kW, proxy) power_kw_proxy | 69 MW | Epoch AI · Aug 2026 |
Rows 1 to 5 of 5
03 / Location
7601 State Hwy 105, Trenton, SC 29847, USA
Trenton, SC
No linked facilities sourced yet.
Facility attributes are resolved from publishable claims. Power is a kW proxy derived from permitted generator nameplate capacity where available. It is not a measured load value.
Facility record as of
August 7, 2026