Power, permit proxy
F0182 MW
Generator nameplate method
Power, permit proxy
F0182 MW
Generator nameplate method
Buildings
F020
Campus child count
Current status
F03Operational
Latest accepted lifecycle claim
Operational date
F04Jan 2024
Milestone date, when available
01 / Lifecycle record
Reached milestones show the date and source. Cancelled, unknown, and verbatim source states render off the canonical path.
Announced / planned
Not reached
Permitted
Not reached
Under construction
Not reached
Completed
Not reached
Operational
Jan 2024
Jan 202402 / Provenance ledger
Every public value is a claim linked to a named source record and an as-of date.
Select claim group
Lifecycle status lifecycle_status | Operational | Epoch AI · Jan 2024 |
Name name | CoreWeave Chester VA | Epoch AI · Jun 2027 |
Occupancy date occupancy_date | 2024-01-31 | Epoch AI · Jan 2024 |
Operator operator | CoreWeave | Epoch AI · Jun 2027 |
Power (kW, proxy) power_kw_proxy | 82 MW | Epoch AI · Jun 2027 |
Rows 1 to 5 of 5
03 / Location
1401 Meadowville Technology Parkway, Chester, VA
Chester, VA
No linked facilities sourced yet.
Facility attributes are resolved from publishable claims. Power is a kW proxy derived from permitted generator nameplate capacity where available. It is not a measured load value.
Facility record as of
June 30, 2027