Power, permit proxy
F01213 MW
Generator nameplate method
Record state
Publishable claims resolved
Power, permit proxy
F01213 MW
Generator nameplate method
Buildings
F020
Campus child count
Current status
F03Operational
Latest accepted lifecycle claim
Operational date
F04Dec 2024
Milestone date, when available
01 / Lifecycle record
Reached milestones show the date and source. Cancelled, unknown, and verbatim source states render off the canonical path.
Announced / planned
Not reached
Permitted
Not reached
Under construction
Not reached
Completed
Not reached
Operational
Dec 2024
Dec 202402 / Provenance ledger
Every public value is a claim linked to a named source record and an as-of date.
Select claim group
Lifecycle status lifecycle_status | Operational | Epoch AI · Dec 2024 |
Name name | AWS New Albany | Epoch AI · Jul 2027 |
Occupancy date occupancy_date | 2024-12-01 | Epoch AI · Dec 2024 |
Operator operator | Amazon | Epoch AI · Jul 2027 |
Power (kW, proxy) power_kw_proxy | 213 MW | Epoch AI · Jul 2027 |
Rows 1 to 5 of 5
03 / Location
13360 Miller Rd NW
No linked facilities sourced yet.
No linked facilities sourced yet.
Facility attributes are resolved from publishable claims. Power is a kW proxy derived from permitted generator nameplate capacity where available. It is not a measured load value.
Facility record as of
July 1, 2027